Ready questions for energy, grid, construction, real estate and finance. One click opens the question in Wai — it draws the layout in CAD and 3D, runs the calculation and gives the report.
Wai draws the layout with its bill of quantities; DWG, DXF, IFC and Revit files are in Wai.
Draw a 150 MW wind farm layout at 40.19, 29.06 (Bursa) with turbine spacing
Draw a hybrid plant at 37.60, 14.02 (Sicily, Italy): 50 MWp PV + 25 MW / 100 MWh BESS
Draw a 20 MW green hydrogen electrolyser plant at 41.88, -87.63 (Chicago, Illinois)
Draw a 154/33 kV substation 2 x 50 MVA
Draw the single-line diagram (SLD) of a 20 MW PV plant with 2 x 10 MVA transformers
SLD of a 34.5/0.4 kV building substation, 1 x 1000 kVA, with LV main board
Draw a 2 x 660 MW coal power plant in 3D
Draw a 3-storey office 30 x 16 m in Bucharest and show its heat loss and gain
Design a 3-bedroom house on a 600 m² plot with a pool
Fit a residential block on a 40 x 60 m parcel at 39.93, 32.86 (Ankara) with FAR 2.0 and coverage 0.40
Parametric drawing routines and drawing checks.
Write an AutoLISP for an A1 title block with a revision table
Write an AutoLISP for a stair, floor height 3 m, plan and section
Write an AutoLISP for an HEB 300 steel section
Write an AutoLISP for an EN 1092-1 PN16 DN200 flange
Write an AutoLISP for a PV table, 2 x 28 modules, 25° tilt
Write an AutoLISP for a single-line diagram of a 34.5 kV feeder with breaker and transformer
Write an AutoLISP for a road long section with chainage marks every 20 m
Write an AutoLISP that numbers all closed polylines and writes their areas
AutoCAD: audit my drawing and list the problems
Revit: run a clash check between beams and ducts
Solar, wind, storage, hydro, hydrogen and thermal.
What capacity fits on 50 ha near Aksaray - solar, wind or BESS?
Feasibility study for a 20 MW solar plant in Konya
Bankable feasibility for a 50 MW solar farm at 38.1, 32.9 on 80 ha
100 MWp solar PV plant in Romania - yield, LCOE and IRR
120 MW wind farm at 7.4 m/s - choose the turbine
Size a 100 MW / 2 h BESS in Romania
BESS revenue in Germany: arbitrage and balancing, 50 MW / 100 MWh
Run-of-river HES with 85 m head and 6 m3/s flow
20 MW PEM electrolyser with 60 MWp solar at latitude 38 - tonnes per year and LCOH
800 MW combined cycle gas plant concept
Site assessment at 39.9208, 32.8541 - soil, seismic zone and solar resource
Substations, lines, cables and protection.
Grid connection for 80 MW PV + 40 MW BESS at 110 kV, 12 km line
110/33 kV substation, 2 x 63 MVA, AIS, 2 lines, 12 feeders - cost and programme
Ankara - Konya 380 kV line, how many towers and cost?
HVDC vs AC for 1000 MW over 180 km submarine cable
Short-circuit current at the LV board of a 1000 kVA, uk 6 % transformer (IEC 60909)
Cable size and voltage drop: 240 mm² Cu, 180 m, 350 A, 400 V
Power factor correction: 800 kW at cos φ 0.82 to 0.97 - kVAr and steps
Lightning protection of a 40 m building with the rolling sphere method, class II
Earth rod resistance: 3 m rod in 100 Ω·m soil - how many rods for 2 Ω?
UPS battery autonomy: 120 kW for 10 minutes
Zoning, safety, heating, cooling and water.
Zoning check: parcel 1,200 m², TAKS 0.35, KAKS 2.0 - how many floors and m²?
Fire escape design for a 10-storey residential building - stairs, doors, distances
Electrical loads of a 28-flat residential building with 6 shops - demand, transformer, risers
Heat loss of a 120 m² flat in Ankara (EN 12831)
Cooling load of a 2,000 m² office in Dubai, hourly with the real sun
Domestic hot water demand and tank size for a 120-room hotel
Booster pump set for a 15-storey building - flow, head, power
Sprinkler water demand for an ordinary hazard OH2 warehouse (EN 12845)
How many lifts for a 20-storey residential tower with 160 flats?
Envelope U-values to reach energy class A in Istanbul - wall, roof, window
For owners, buyers and developers.
Rooftop solar for a house in Istanbul, Türkiye: kWp, yield and payback
Is a home battery worth it with a 7 kWp solar system?
Combi boiler or heat pump for a 100 m² flat - running cost compared
How much does insulating my 120 m² flat save a year in Istanbul?
Earthquake: what to check in an apartment built in 1995 before buying
Home EV charger: 7.4 or 11 kW, cable and breaker?
Rainwater harvesting for a 600 m² garden - tank size
Project finance, loans and market data.
LCOE for 50 MW, 900 USD/kW, 85 GWh/y, WACC 8%
What PPA price gives 12% equity IRR for 50 MW solar, capex 0.6 $/W?
Is 70% gearing at 7.5% bankable for a 100 MW PV with 1.4 TWh over 25 years?
Loan of 2 million at 9% for 10 years, quarterly payments - schedule
Romania BESS market size and trend
EUR/RON exchange rate trend this year
A selection from Wai's library of more than 29,000 ready questions. See the full list of checked questions →
Powered by Wai and WaiMAP · Wai also works inside Claude, ChatGPT and other AI assistants through its connector.
A few lines on the site, the technology and the timing. The right WHT team answers.