Home / Wai Prompt Library
WHT Global

Wai Prompt Library.

Ready questions for energy, grid, construction, real estate and finance. One click opens the question in Wai — it draws the layout in CAD and 3D, runs the calculation and gives the report.

64 prompts

Draw it in Wai — CAD, 2D and 3D

Wai draws the layout with its bill of quantities; DWG, DXF, IFC and Revit files are in Wai.

Draw a 150 MW wind farm layout at 40.19, 29.06 (Bursa) with turbine spacing

Draw a hybrid plant at 37.60, 14.02 (Sicily, Italy): 50 MWp PV + 25 MW / 100 MWh BESS

Draw a 20 MW green hydrogen electrolyser plant at 41.88, -87.63 (Chicago, Illinois)

Draw a 154/33 kV substation 2 x 50 MVA

Draw the single-line diagram (SLD) of a 20 MW PV plant with 2 x 10 MVA transformers

SLD of a 34.5/0.4 kV building substation, 1 x 1000 kVA, with LV main board

Draw a 2 x 660 MW coal power plant in 3D

Draw a 3-storey office 30 x 16 m in Bucharest and show its heat loss and gain

Design a 3-bedroom house on a 600 m² plot with a pool

Fit a residential block on a 40 x 60 m parcel at 39.93, 32.86 (Ankara) with FAR 2.0 and coverage 0.40

AutoCAD, AutoLISP and Revit

Parametric drawing routines and drawing checks.

Write an AutoLISP for an A1 title block with a revision table

Write an AutoLISP for a stair, floor height 3 m, plan and section

Write an AutoLISP for an HEB 300 steel section

Write an AutoLISP for an EN 1092-1 PN16 DN200 flange

Write an AutoLISP for a PV table, 2 x 28 modules, 25° tilt

Write an AutoLISP for a single-line diagram of a 34.5 kV feeder with breaker and transformer

Write an AutoLISP for a road long section with chainage marks every 20 m

Write an AutoLISP that numbers all closed polylines and writes their areas

AutoCAD: audit my drawing and list the problems

Revit: run a clash check between beams and ducts

Energy projects

Solar, wind, storage, hydro, hydrogen and thermal.

What capacity fits on 50 ha near Aksaray - solar, wind or BESS?

Feasibility study for a 20 MW solar plant in Konya

Bankable feasibility for a 50 MW solar farm at 38.1, 32.9 on 80 ha

100 MWp solar PV plant in Romania - yield, LCOE and IRR

120 MW wind farm at 7.4 m/s - choose the turbine

Size a 100 MW / 2 h BESS in Romania

BESS revenue in Germany: arbitrage and balancing, 50 MW / 100 MWh

Run-of-river HES with 85 m head and 6 m3/s flow

20 MW PEM electrolyser with 60 MWp solar at latitude 38 - tonnes per year and LCOH

800 MW combined cycle gas plant concept

Site assessment at 39.9208, 32.8541 - soil, seismic zone and solar resource

Grid and electrical

Substations, lines, cables and protection.

Grid connection for 80 MW PV + 40 MW BESS at 110 kV, 12 km line

110/33 kV substation, 2 x 63 MVA, AIS, 2 lines, 12 feeders - cost and programme

Ankara - Konya 380 kV line, how many towers and cost?

HVDC vs AC for 1000 MW over 180 km submarine cable

Short-circuit current at the LV board of a 1000 kVA, uk 6 % transformer (IEC 60909)

Cable size and voltage drop: 240 mm² Cu, 180 m, 350 A, 400 V

Power factor correction: 800 kW at cos φ 0.82 to 0.97 - kVAr and steps

Lightning protection of a 40 m building with the rolling sphere method, class II

Earth rod resistance: 3 m rod in 100 Ω·m soil - how many rods for 2 Ω?

UPS battery autonomy: 120 kW for 10 minutes

Buildings and MEP

Zoning, safety, heating, cooling and water.

Zoning check: parcel 1,200 m², TAKS 0.35, KAKS 2.0 - how many floors and m²?

Fire escape design for a 10-storey residential building - stairs, doors, distances

Electrical loads of a 28-flat residential building with 6 shops - demand, transformer, risers

Heat loss of a 120 m² flat in Ankara (EN 12831)

Cooling load of a 2,000 m² office in Dubai, hourly with the real sun

Domestic hot water demand and tank size for a 120-room hotel

Booster pump set for a 15-storey building - flow, head, power

Sprinkler water demand for an ordinary hazard OH2 warehouse (EN 12845)

How many lifts for a 20-storey residential tower with 160 flats?

Envelope U-values to reach energy class A in Istanbul - wall, roof, window

Real estate and home

For owners, buyers and developers.

Rooftop solar for a house in Istanbul, Türkiye: kWp, yield and payback

Is a home battery worth it with a 7 kWp solar system?

Combi boiler or heat pump for a 100 m² flat - running cost compared

How much does insulating my 120 m² flat save a year in Istanbul?

Earthquake: what to check in an apartment built in 1995 before buying

Home EV charger: 7.4 or 11 kW, cable and breaker?

Rainwater harvesting for a 600 m² garden - tank size

Finance

Project finance, loans and market data.

LCOE for 50 MW, 900 USD/kW, 85 GWh/y, WACC 8%

What PPA price gives 12% equity IRR for 50 MW solar, capex 0.6 $/W?

Is 70% gearing at 7.5% bankable for a 100 MW PV with 1.4 TWh over 25 years?

Loan of 2 million at 9% for 10 years, quarterly payments - schedule

Romania BESS market size and trend

EUR/RON exchange rate trend this year

A selection from Wai's library of more than 29,000 ready questions. See the full list of checked questions →

Powered by Wai and WaiMAP · Wai also works inside Claude, ChatGPT and other AI assistants through its connector.

Start a project

Tell WHT the place and the goal.

A few lines on the site, the technology and the timing. The right WHT team answers.