Home / Renewable Energy / Data Renoversity
WHT Global

Data Renoversity.

The data-centre era is over — the Data Renoversity era has begun. Renewable-powered, self-supplied data infrastructure that sits at peace with the environment and the people around it. IP application filed.

Read the documents

Five commitments

What Data Renoversity stands for.

01

Grid independence

Runs on its own power. No connection queue to wait in.

02

Cooling is not a burden

No evaporation, no wasted water, no parasitic cooling load.

03

About 20% less energy

Compared with new builds in the usual 1.2–1.3 PUE band.

04

Zero water loss

Waste heat is reused instead of dumped.

05

Nothing wasted

Surplus energy becomes a product, not a loss.

Where it fits

Old power sites, new purpose.

Closed and closing power-plant sites already have land, water access and grid rights. Data Renoversity gives them a second life as clean, quiet and carbon-free data infrastructure, and can turn the campus into a heat source for the nearby town.

The architecture is protected; an IP application has been filed. Technical details are shared with selected partners.

Documents

Brief, concept and principles.

The public document set. Click a document to read it here.

WaiMAP

Find suitable sites with WaiMAP.

Screen sites on the real map: land, hazards, grid and water.

Open WaiMAP →
Start a project

Tell us the place and the goal.

A few lines on the site, the technology and the timing. The right WHT team answers.