Yedigöl Hydroelectric Power Plant

YEAR LOCATION
Yedigöze Sani Bey Hydroelectric Power Plant

YEAR LOCATION The Santral Seyhan is a hydraulic power plant located on the Seyhan River, with a rock-fill dam featuring a concrete-coated upstream face, standing 105 meters above the thalweg and 131 meters above the foundation. The plant has a maximum project discharge of 369.84 m³/s, a gross head of 95.50 meters, and an installed […]
Köprü Hydroelectric Power Plant

YEAR LOCATION Köprü HEPP, which we commissioned in 2013, is located on the Göksu branch of Adana Seyhan River. With an RCC body, the dam has 2 78MW Francis turbines with a total capacity of 156 MW. The annual electricity generation capacity of our power plant is 383.9 GWh.
Menge Hydroelectric Power Plant

YEAR LOCATION Menge Power Plant is located at Feke and Kozan district of Adana province, has an installed capacity of 89 MW and is connected to 154kV Feke basin. The first phase of the temporary acceptance of the power plant was completed on December 22, 2011, and the second phase was completed on January 27, […]
Bayra HEPP – 9,36 MW – Iğdır

YEAR LOCATION Details of the project Bayra Regulator and Hydroelectric Power Plant, established in Tuzluca district of Iğdır province, operates on an area of 231,000 m². The plant has an installed capacity of 9.36 MW. Bayra HEPP produces an average of 16 million kWh of electricity per year and meets the annual electricity needs of […]
Soğukpınar HEPP – 9,32 MW – Giresun

YEAR LOCATION Details of the project The Soğukpınar Regulator and Hydroelectric Power Plant, established in Espiye district of Giresun province, operates on an area of 62,500 m². The plant has an installed capacity of 9.32 MW. Soğukpınar HEPP produces an average of 20 million kWh of electricity per year and meets the annual electricity needs […]
Köprübaşı HEPP – 15,5 MW – Gümüşhane

YEAR LOCATION CATEGORY Details of the project The Kayaköprü 1 Regulator and Hydroelectric Power Plant, established in the Yağlıdere district of Giresun province, operates on an area of 266,300 m². The plant has an installed capacity of 32.46 MW. Kayaköprü 1 HEPP produces an average of 89 million kWh of electricity annually and meets the […]
Kayaköprü 2 HEPP – 10,6 MW – Giresun

YEAR LOCATION CATEGORY Details of the project The Kayaköprü 1 Regulator and Hydroelectric Power Plant, established in the Yağlıdere district of Giresun province, operates on an area of 266,300 m². The plant has an installed capacity of 32.46 MW. Kayaköprü 1 HEPP produces an average of 89 million kWh of electricity annually and meets the […]
Kayaköprü 1 HEPP – 32,46 MW – Giresun

YEAR LOCATION CATEGORY Details of the project The Kayaköprü 1 Regulator and Hydroelectric Power Plant, established in the Yağlıdere district of Giresun province, operates on an area of 266,300 m². The plant has an installed capacity of 32.46 MW. Kayaköprü 1 HEPP produces an average of 89 million kWh of electricity per year and meets […]
Kıy HEPP – 24,6 MW – Adana

YEAR LOCATION CATEGORY Details of the project The Kıyı Regulator and Hydroelectric Power Plant, established in the Kozan district of Adana province, operates on an area of 396,000 m². The plant has an installed capacity of 24.6 MW. Kıyı HEPP produces an average of 75 million kWh of electricity annually and meets the annual electricity […]