5 MW Banca Hybrid Project

YEAR LOCATION Project Specifications Location: Banca, Romania PV Capacity: 5 MW BESS Capacity: 2 MWh Grid Connection: 20kV (secured) Land Status: Fully secured Permit Status: Ready-to-build Key Highlights Latest bifacial technology 30% higher generation Advanced tracking system High-efficiency N-type cells 30-year performance warranty Ready for construction
200 MW Banca Stand-Alone BESS Project

YEAR READY to BUILD LOCATION Project Overview The Banca Stand-Alone Battery Energy Storage System (BESS) project, located in Banca, Romania, is a pivotal development in Romania’s renewable energy landscape. With a capacity of 200 MW and a storage duration of 2-4 hours, this project is designed to enhance grid stability, support renewable energy integration, and capitalize […]
70 MWp Maxineni Hybrid PV & BESS Project

YEAR READY to BUILD LOCATION Project Overview The Maxineni projects in Romania include a 70 MWp Hybrid PV & BESS project and a 2×48 MW/96 MWh Stand-Alone BESS project, both critical to Romania’s renewable energy expansion and grid stability goals. These initiatives align with the country’s 8.3 GW solar target by 2030 and €150M Modernization Fund […]
430 MW SOPOT PV PROJECT

YEAR Near to RTB LOCATION Project Overview The Sopot Photovoltaic Power Plant, located in Sopot, Dolj County, Romania, is a 430 MW utility-scale solar project nearing Ready-to-Build (RTB) status. Leveraging advanced bifacial technology and single-axis trackers, this project is set to become one of Romania’s largest solar installations, contributing to the country’s 8.3 GW solar […]
Yedigöl Hydroelectric Power Plant

YEAR LOCATION
Yedigöze Sani Bey Hydroelectric Power Plant

YEAR LOCATION The Santral Seyhan is a hydraulic power plant located on the Seyhan River, with a rock-fill dam featuring a concrete-coated upstream face, standing 105 meters above the thalweg and 131 meters above the foundation. The plant has a maximum project discharge of 369.84 m³/s, a gross head of 95.50 meters, and an installed […]
Köprü Hydroelectric Power Plant

YEAR LOCATION Köprü HEPP, which we commissioned in 2013, is located on the Göksu branch of Adana Seyhan River. With an RCC body, the dam has 2 78MW Francis turbines with a total capacity of 156 MW. The annual electricity generation capacity of our power plant is 383.9 GWh.
Menge Hydroelectric Power Plant

YEAR LOCATION Menge Power Plant is located at Feke and Kozan district of Adana province, has an installed capacity of 89 MW and is connected to 154kV Feke basin. The first phase of the temporary acceptance of the power plant was completed on December 22, 2011, and the second phase was completed on January 27, […]
Bayra HEPP – 9,36 MW – Iğdır

YEAR LOCATION Details of the project Bayra Regulator and Hydroelectric Power Plant, established in Tuzluca district of Iğdır province, operates on an area of 231,000 m². The plant has an installed capacity of 9.36 MW. Bayra HEPP produces an average of 16 million kWh of electricity per year and meets the annual electricity needs of […]
Soğukpınar HEPP – 9,32 MW – Giresun

YEAR LOCATION Details of the project The Soğukpınar Regulator and Hydroelectric Power Plant, established in Espiye district of Giresun province, operates on an area of 62,500 m². The plant has an installed capacity of 9.32 MW. Soğukpınar HEPP produces an average of 20 million kWh of electricity per year and meets the annual electricity needs […]