Bayra HEPP – 9,36 MW – Iğdır

YEAR LOCATION Details of the project Bayra Regulator and Hydroelectric Power Plant, established in Tuzluca district of Iğdır province, operates on an area of ​​231,000 m². The plant has an installed capacity of 9.36 MW. Bayra HEPP produces an average of 16 million kWh of electricity per year and meets the annual electricity needs of […]

Soğukpınar HEPP  – 9,32 MW – Giresun

YEAR LOCATION Details of the project The Soğukpınar Regulator and Hydroelectric Power Plant, established in Espiye district of Giresun province, operates on an area of ​​62,500 m². The plant has an installed capacity of 9.32 MW. Soğukpınar HEPP produces an average of 20 million kWh of electricity per year and meets the annual electricity needs […]

Köprübaşı HEPP – 15,5 MW – Gümüşhane

YEAR LOCATION CATEGORY Details of the project The Kayaköprü 1 Regulator and Hydroelectric Power Plant, established in the Yağlıdere district of Giresun province, operates on an area of ​​266,300 m². The plant has an installed capacity of 32.46 MW. Kayaköprü 1 HEPP produces an average of 89 million kWh of electricity annually and meets the […]

Kayaköprü 2 HEPP – 10,6 MW – Giresun

YEAR LOCATION CATEGORY Details of the project The Kayaköprü 1 Regulator and Hydroelectric Power Plant, established in the Yağlıdere district of Giresun province, operates on an area of 266,300 m². The plant has an installed capacity of 32.46 MW. Kayaköprü 1 HEPP produces an average of 89 million kWh of electricity annually and meets the […]

Kayaköprü 1 HEPP – 32,46 MW – Giresun

YEAR LOCATION CATEGORY Details of the project The Kayaköprü 1 Regulator and Hydroelectric Power Plant, established in the Yağlıdere district of Giresun province, operates on an area of ​​266,300 m². The plant has an installed capacity of 32.46 MW. Kayaköprü 1 HEPP produces an average of 89 million kWh of electricity per year and meets […]

Kıy HEPP – 24,6 MW – Adana

YEAR LOCATION CATEGORY Details of the project The Kıyı Regulator and Hydroelectric Power Plant, established in the Kozan district of Adana province, operates on an area of ​​396,000 m². The plant has an installed capacity of 24.6 MW. Kıyı HEPP produces an average of 75 million kWh of electricity annually and meets the annual electricity […]

Kıran HES – 9,94 MW – Giresun

YEAR LOCATION CATEGORY Details of the project The Kıran Regulator and Hydroelectric Power Plant, established in Espiye district of Giresun province, operates on an area of 500,900 m². The plant has an installed capacity of 9.94 MW. Kıran HEPP produces an average of 38 million kWh of electricity annually and meets the annual electricity needs […]

YAVUZ HYDROELECTRIC POWER PLANT

YEAR LOCATION CATEGORY Details of the project Project Technical SpecificationsInstalled Power: 3 x 7,50 MWm =22,50 MWmAverage Production:82,00 GWh / yearProject Flow Rate:106,70 m3/scTransmission Channel CharacteristicsTotal Length: 3 235,00 metresTrapeze Type: 1 981,00 metresVertical Channel Type: 1 254,00 metresNet Head: 23,86 metresPenstock Pipe Diameter: 3 x 3500 mmRegulator Type: 4 x Radial Gate, Concrete Weighted […]

MIDILLI HYDROELECTRIC PLANT

YEAR LOCATION CATEGORY Details of the project Scope of the Work: Midilli Hydroelectric PlantProject Technical SpecificationsInstalled Capacity: 3 x 34,24 MWm =102,72 MWmAverage Production: 416,00 GWh/yearProject Flow Rate: 105,00 m3/scTransmission Channel CharacteristicsTrapeze Channel Type: 2 090,00 metersVertical Channel Type: 16 465,30 metersTunnel: 5 043,70 metresTunnel CharacteristicsTunnel Type: Circular, with Free SurfaceTunnel Diameter: 6,00 metersTotal Tunnel […]

AKINCI HYDROELECTRIC POWER PLANT

YEAR CATEGORY Details of the project Project Technical Specifications Installed Power: 3 X 34,24 Mwm =102,72 Mwm Average Production: 416,00 GWH/year Project Flow Rate: 105,00 m3/sc Transmission Channel CharacteristicsTotal channel length: 23 599,00 metresTrapeze channel type: 2.090,00 metresVertical Channel Type: 16.465,30 metresTunnel: 5.04,70 metresTunnel CharacteristicsTunnel type: Circular, Free Surface tunnel diameter: 6,00 metresTotal tunnel length: 5 043,70 metresNet Head: 106,24 […]

WE EXIST TO BUILD GREAT THINGS