Energy, Hydropower

Yedigöze Sani Bey Hydroelectric Power Plant

YEAR

2009

LOCATION

Adana

Yedigöze Sani Bey Hydroelectric Power Plant

The Santral Seyhan is a hydraulic power plant located on the Seyhan River, with a rock-fill dam featuring a concrete-coated upstream face, standing 105 meters above the thalweg and 131 meters above the foundation. The plant has a maximum project discharge of 369.84 m³/s, a gross head of 95.50 meters, and an installed capacity of 317 MW, with two units.

Pursuing the Vision, Accomplishing the Mission, Realizing the Dream