Menge Power Plant is located at Feke and Kozan district of Adana province, has an installed capacity of 89 MW and is connected to 154kV Feke basin. The first phase of the temporary acceptance of the power plant was completed on December 22, 2011, and the second phase was completed on January 27, 2012. The generation license of the facility, which has an annual electricity generation capacity of 203.1 GWh, was obtained on July 6, 2006 for 49 years. The project was granted a “Carbon Gold Certificate” by The Gold Standard Foundation.