Project Overview

The Maxineni projects in Romania include a 70 MWp Hybrid PV & BESS project and a 2×48 MW/96 MWh Stand-Alone BESS project, both critical to Romania’s renewable energy expansion and grid stability goals. These initiatives align with the country’s 8.3 GW solar target by 2030 and €150M Modernization Fund for BESS.

Technical Specifications

  • Location: Maxineni, Brăila County, Romania
  • PV Capacity: 70 MWp
  • BESS Capacity: 20 MW/40 MWh (2-hour storage)
  • Panels: ~168,000 JA Solar JAM72D30 MB 550W bifacial panels
  • Inverters: Huawei SUN2000-240KTL-H0 (98.5% efficiency)
  • Battery Type: Lithium-ion (LFP chemistry)
  • Grid Connection: 220 kV to Transelectrica’s network
  • Land Area: ~100 hectares (secured via lease)

Project Components

  • Bak SPV: 20 MW PV + 15 MW/30 MWh BESS
  • Mar SPV: 20 MW PV + 15 MW/30 MWh BESS
  • Pek SPV: 20 MW PV + 15 MW/30 MWh BESS
  • Zenit SPV: 10 MW PV + 5 MW/10 MWh BESS