The structure was designed by request of two respectable investors. And designed with their rigorous expectations, project location’s geographical and demographical specifications.
But in time, decided to suspend the project because feasibility etudes showed that the demographic tourism movements weren’t enough, and the location has an ineffective population to implement the project.