Details of the project

The Kayaköprü 1 Regulator and Hydroelectric Power Plant, established in the Yağlıdere district of Giresun province, operates on an area of 266,300 m². The plant has an installed capacity of 32.46 MW.

Kayaköprü 1 HEPP produces an average of 89 million kWh of electricity annually and meets the annual electricity needs of 20,049 residences.

With the investment, 53,556 tons of carbon emission reduction is achieved per year, and thanks to environmentally friendly energy production, energy production equal to the environmental benefit of 2,550,314 trees will be realized yearly.

design concepts. The entrance floor, stairs, info desk, and elevator area were designed with fine details to create a meeting atmosphere for the patients and their relatives. Bright surfaces are provided with dark-colored mirrors to reflect the height of the line minimally on the penthouse. The divisions are detailed to create privacy in the VIP areas and transparent surfaces are supported with vectorial patterned films.

WE EXIST TO BUILD GREAT THINGS