Details of the project

The Kıyı Regulator and Hydroelectric Power Plant, established in the Kozan district of Adana province, operates on an area of ​​396,000 m². The plant has an installed capacity of 24.6 MW.

Kıyı HEPP produces an average of 75 million kWh of electricity annually and meets the annual electricity needs of 17,025 residences.

With the investment, 45,749 tons of carbon emission reduction is achieved per year, and thanks to environmentally friendly energy production, energy production equal to the environmental benefit of 2,165,685 trees will be achieved yearly.