Energy

YAVUZ HYDROELECTRIC POWER PLANT

YEAR

2009

LOCATION

Türkiye

CATEGORY

Energy

YAVUZ HYDROELECTRIC POWER PLANT

Details of the project

Project Technical Specifications
Installed Power: 3 x 7,50 MWm =22,50 MWm
Average Production:82,00 GWh / year
Project Flow Rate:106,70 m3/sc
Transmission Channel Characteristics
Total Length: 3 235,00 metres
Trapeze Type: 1 981,00 metres
Vertical Channel Type: 1 254,00 metres
Net Head: 23,86 metres
Penstock Pipe Diameter: 3 x 3500 mm
Regulator Type: 4 x Radial Gate, Concrete Weighted Power House
Hydraulic Turbines: 4 x Radial Gate, Concrete Weighted Power House
Power House Generators: : 3 x Vertical Axis Synchronous

Pursuing the Vision, Accomplishing the Mission, Realizing the Dream